Contact

Headquarters Speyer
An der Hofweide 7
D-67346 Speyer

Phone: +49 6232 91906-0
Fax: +49 6232 91906-100
Email: info.sp@spiratec-ag.com

28 October 2009

Scaling of migration projects

SpiraTec gives talk in the Customer Presentations sector at the EMEA Honeywell User Group Conference in Lisabon/Portugal.

Scalable Migration with Minimal Re-Engineering, Risk and Plant Shutdown Legacy system migration can be seen as a huge cost and risk factor for production. But migration projects should be also seen as a huge opportunity to streamline DCS architecture and reduce lifecycle costs. The overall control system of each production plant consists of different automation systems/equipments like I/Os, DCS, PLCs, historian, APC, MES, LIMS, ERP-interface and more. Not every system or equipment has to be replaced. To achieve the goal to minimize engineering, risk and downtime you have to perform the following steps: define the systems and equipment to replace, define migration steps and timeline, inventory of obsolete systems, minimization of interface changes between existing systems and the new system, develop standards and enforce the usage, redesign security and network concepts, consider long-term product roadmaps and redesign for the new system. This presentation will discuss aspects of the overall migration plan, the migration concept and how to use Experion PKS to minimize interface changes, using new functionality as well as standards like templates and bulk building to achieve these goals. (Rainer Spies)